Our quality control system as well as training programs are done in-house. Our support team, composes of skilled and adept technicians and trained inspectors, is in-charge and responsible to maintain the quality of the products.
|
|
|
Production standards are well adopted among staff. They are trained to strictly obey quality standards and guidelines. Quality control and testing equipment are done in-house to keep watch of the development of the product. Preliminary QC is observed as early as the procurement of the raw materials and components. Rigid checking is done in this stage to avoid any drawback. In each manufacturing process such as weaving, cutting, dyeing, brushing, and lamination, QC is done to ensure that the items before it reached the next stage, is defect-free. Our lab quality analysis uses state-of-the-art equipment to randomly select the hook and loop tape for testing its strength and frequency, so that each batch of order conforms to customers' requirements. Finished goods are checked again before final packing. |
|
Cycles |
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
| Test criterion :1.BS7271 (UK).... 2.FED-STD-191 (U.S.A.).... 3.CNS (TAIWAN).... 4.JIS-L-1096 (JAPAN) |
|
|
|||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
| Physical Characteristics | |
| Heat resistance | Melting point:Hook 230.C, Loop 180.C ; Hook becoming soft at 180.C and begins to melt from 215-220.c |
| Chill resistance | Unable use at temperatures below 30.C, The lower the temperature, the stronger the tensile strength. Durability, however is somewhat reduced at low temperatures. |
| Humidity |
In humidity over 90% RH, tesile strength is somewhat reduced. |